ADVANCED MANUFACTURING LAB

BILL OF MATERIAL FORMAT

7/20/04

 

 

 

PROJECT NAME

DATE

 

 

PRODUCT MAIN ASSEMBLY DRAWING (MA)

PRODUCT SUBASSEMBLY DRAWINGS (SA)

 

ITEMS 1-99

 

 

PROCESS FIXTURE, TOOLING OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE 1 (PF, T,QC)

 

ITEMS 101-199

 

 

PROCESS FIXTURE, TOOLING OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE 2 (PF, T,QC)

 

ITEMS 201-299

 

 

PROCESS FIXTURE, TOOLING OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE n (PF, T,QC)

 

ITEMS n01-n99

 

ASSEMBLY SYSTEM FLOW CHART

 

ASSEMBLY SYSTEM PLAN VIEW

 

AUTOMATION AND ASSEMBLY FIXTURE, ROBOT END EFFECTOR OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE 1 (AF,RE,QC)

 

ITEMS 1001-1099

 

 

AUTOMATION AND ASSEMBLY FIXTURE, ROBOT END EFFECTOR OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE 2 (AF,RE,QC)

 

ITEMS 1101-1199

 

 

AUTOMATION AND ASSEMBLY FIXTURE, ROBOT END EFFECTOR OR QUALITY CONTROL GAUGE/INSPECTION FIXTURE n (AF,RE,QC)

 

ITEMS 1(n-1)01-1(n-1)99